• Home
  • msproject books
  • More
    • Home
    • msproject books
  • Home
  • msproject books

STRUCTURAL ENGINEERING PHILOSOPHY, ART AND ARCHITECTURE

STRUCTURAL ENGINEERING PHILOSOPHY, ART AND ARCHITECTURESTRUCTURAL ENGINEERING PHILOSOPHY, ART AND ARCHITECTURESTRUCTURAL ENGINEERING PHILOSOPHY, ART AND ARCHITECTURE

Book cover of 'Reflections on Seismic Design' by Mentor Llunji with a building outline.

REFLECTIONS ON SEISMIC DESIGN

Publisher ‏ : ‎ MSPROJECT

Publication date ‏ : ‎ 15 April 2026

Language ‏ : ‎ English

Print length ‏ : ‎ 421 pages

ISBN : ‎  978-9911-9650-0-4 

Item Weight ‏ : ‎ 1.35kg

Dimensions ‏ : ‎ 25x19x2.8cm

Format: Hardcover

Price: $60

Free shipping

Order Now
Book cover titled 'Towards a New Engineering' by Mentor Llunji with abstract art.

TOWARDS A NEW ENGINEERING

Publisher ‏ : ‎ MSPROJECT

Publication date ‏ : ‎ 25 August 2022

Language ‏ : ‎ English

Print length ‏ : ‎ 480 pages

ISBN : ‎ 978-9940-665-02-9

Item Weight ‏ : ‎ 1.4kg

Dimensions ‏ : ‎ 25x19x2.8cm

Format: Hardcover

Price: $60

Free shipping

OUT OF STOCK
Book cover on seismic architecture showcasing earthquake-resistant structures.

SEISMIC ARCHITECTURE

Publisher ‏ : ‎ MSPROJECT

Publication date ‏ : ‎ 17 November 2016

Language ‏ : ‎ English

Print length ‏ : ‎ 495 pages

ISBN : ‎   978-9940-979-40-9 

Item Weight ‏ : ‎ 1.45kg

Dimensions ‏ : ‎ 25x19x2.8cm

Out of stock

THE 'VIRTUAL' BOOKSTORE

This 'virtual' bookstore features the works of Mentor Llunji - a collection of writings and philosophical reflections on structural engineering profession, its past, present and future. Rather than adhering strictly to conventional academic frameworks, these writings emphasize clarity, practical insight, and professional responsibility, while maintaining technical depth and intellectual honesty. Across the collection, the author explores the relationship between structural engineering, architecture, and art.

Key themes include contemporary approaches to seismic design and structural analysis, as well as broader reflections on how engineering practice evolves in response to modern challenges. The main message of Llunji's books is that structural design has nothing to do with exactness, but with understanding. These writings are a guide to critical thinking, a much-needed tool in our digital era, aimed at provoking curiosity, encouraging reflection, and helping engineers develop their own informed approach to design. 


PDF Viewer

Download PDF

PDF Viewer

Download PDF

Reviews


Copyright © 2026 Mentor Llunji - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept